logotype

Offshore modules

Cuttings reinjection

  • Compliant with North Sea rules and regulations: Norsok D-001 and DNV Offshore Standard OS-E101.
  • Flexible module arrangements, capable of being adapted to different configurations.
  • Designed so as to ensure reduced rig up and rig down operation times.
  • Light modules, designed to be lifted with operational restrictions in place (R<12 tons).
  • Modules compliant with DNV 2.7-1 and 2.7-3 as well as OS-E101 during operation.
  • Coordination with Certifying Body during Design Review.
  • Designed so as to withstand sour service (NACE MR-0175 and ISO 15156).
  • Process piping designed in compliance with ASME B31.3.
  • Weight reports compliant with ISO 19901-5.
  • Documentation for operation, certification book.
  • Assistance to mechanical completion, pre-commissioning check lists and commissioning procedures.